Full Package

CambridgeshireWisbech Coldstore

Wisbech Coldstore, Cambridgeshire

About this project

MJS Construction (March) Ltd were contracted to undertake the entire groundworks and civils package for this contract. This involved construction of all foul and surface water drainage, all external paving, construction of dock levellers and lorry park, all roadways and ducting along with a high tolerance powerfloated concrete floor slab of over 5,000m² with integral cooling system and thermal insulation. This contract lasted over 12 months and involved careful and frequent design and value engineering meetings with the Dutch clients, enabling us to deliver the project safely and efficiently.

Back to projects

Project details

Location
Cambridgeshire
Contract duration
50 weeks
Form of contract
Bespoke
Approx. value
£3m
Main contractor
Partner Logistics